Avatar
官方艺术家
Ashley Angell
网络/多媒体设计师
143,637 查看| 1,406  更新

Tiling is running slightly behind schedule. Guys had to call it a day, but after watching them do it, its a pain-staking fiddly job that requires much exacting precision. Some of those cuts are INSANE. I can tile just fine (and even the tiler having looked at the stuff I did myself said he was impressed with my first attempt at tiling - but MAN I am so glad someone else is doing this. So far, I am really happy with the finish. Floors definitely finished tomorrow though. I think it may look even better than I thought. #AngellReno

8 年多 前 9 赞s  暂无评论  0 shares

关于

阅读全文

位置(城市,国家)以英文标示
Brisbane, Australia
性别
Male